Dux Leaf Guard (250 Pit) - R209
POA
Model: R209
- Dux Leaf Guard (250 Pit) - R209
Installation Instructions:
- Excavate hole for pit to required depth
- Bed Pit on a sand base to set top of pit at installed level
- Mark and cut pipe holes as required
- Install pit in hole
- Connect pipes
- Seal pipe and pit with silicone
- When installing a riser , ensure riser is secured to pit with supplied nuts and bolts, with supplied nuts and bolts, with a washer on each side of the assembly. Seal around Riser and Pit base with silicone.
- Install grate – leave grate installed whilst back-filling and concreting.
- Evenly backfill around pit
- Support pits and riser